BUILDER PROGRAM
Builder Program
One plan. Every lot. Issued permits on repeat for ADU, duplex, cottage cluster and townhouse builders in Oregon and Washington.
FOR REPEAT BUILDERS
A master set for each building type, then each lot adapted and carried through issuance. Terms are set by proposal for the program.
Why it exists
Builders adding homes under Oregon and Washington middle housing rules lose weeks redrawing the same building for every lot. SASHKOV builds the plan once as a master set, then adapts it to each lot: zoning check, site plan, foundation, consultants and submittal through issuance.
What is included
Master plan: design and a permit-ready set for each building type
Structural engineering by licensed engineers SASHKOV brings into the contract
Lot adaptation: buildable envelope, site plan and foundation for each lot
Survey, geotech and stormwater as the lot requires
Submittal and correction responses until the permit is issued
Priority: program lots move to the front of the production schedule
What builders get
Faster permits on every lot after the first
One point of contact for every lot
A predictable path to underwrite each lot
A permit schedule that keeps crews moving
Who it is for
ADU and detached ADU builders
Duplex, triplex and fourplex builders
Cottage cluster and townhouse developers
Prefab and modular builders with repeat models
What it is not
The Builder Program is not a guarantee of approval. SASHKOV is not an architect or engineering firm: licensed scopes are brought into the contract and sealed by licensed professionals.
How the program runs
1.
Send the lot list and the building types you build now
2.
SASHKOV prepares a master set for each building type
3.
Each lot is adapted, submitted and tracked through review
4.
Corrections are answered until the permit is issued
5.
New lots join the program under the same terms
Start the Builder Program
Terms
Set by proposal for the program, then applied to every new lot.
Many lots
List every lot on the form, one per line. SASHKOV groups them by building type.
Response
A reply within one business day, Monday to Friday.
Plans you own
Plans you already have can become the master set after a code review.
