MARKET

Agri-Industrial

Processing, cold storage, packing and farm-adjacent facilities on farm and industrial land across Oregon and Washington.

Typical projects: 2,000 to 100,000 SF on sites under 40 acres.

How SASHKOV helps

Consultant Coordination

Consultant Coordination

SASHKOV defines, contracts, schedules and checks every licensed scope a project needs (survey, geotechnical, structural, civil and MEP) under one contract, with one point of accountability through permit issuance.

Site Investigation & Due Diligence

Site Investigation & Due Diligence

Before a purchase, a lease or a design contract, SASHKOV establishes the site as it actually is: its lines, its ground, its utilities, its water and the constraints on it. Each investigation is scoped to the decision in front of the owner and carried out with licensed professionals under one SASHKOV contract.

Feasibility & Regulatory Strategy

Feasibility & Regulatory Strategy

Approvals are the most common source of delay on Northwest projects. SASHKOV sets out the approval path before design dollars are spent and manages it through issuance.

Permit & Construction Documents

Permit & Construction Documents

The documents SASHKOV issues are the record a project is reviewed, financed and built from. Sets follow the US National CAD Standard and are issued under a quality management system aligned with ISO 9001.

Land Use & Entitlements

Land Use & Entitlements

Zoning, land use reviews, partitions, lot divisions and variances. SASHKOV confirms what a site is allowed to become, prepares the application and carries it through review and conditions of approval.

Corrections & Permit Recovery

Corrections & Permit Recovery

Correction letters, stalled reviews, expired permits and stop-work orders. SASHKOV reads every comment, coordinates the responses across disciplines and resubmits until the permit is issued.

Frequently Asked Questions

I was told my farm building does not need a permit. Is that true?

It may be, and the exemption is narrower than most people are told. It generally covers storing farm equipment and produce or housing livestock, and it tends to end once there is human occupancy, retail sale, public access or employees working in the structure. An office or a restroom is usually enough to end it. We give you that answer in writing before the building goes up.

I was told my farm building does not need a permit. Is that true?

It may be, and the exemption is narrower than most people are told. It generally covers storing farm equipment and produce or housing livestock, and it tends to end once there is human occupancy, retail sale, public access or employees working in the structure. An office or a restroom is usually enough to end it. We give you that answer in writing before the building goes up.

Do I need a land use approval, or just a building permit?

Sometimes both, and the land use path is the long one. Finding that out after the drawings are done is the most expensive way to learn it. It is the first thing we check.

Do I need a land use approval, or just a building permit?

Sometimes both, and the land use path is the long one. Finding that out after the drawings are done is the most expensive way to learn it. It is the first thing we check.

Can I build a processing facility on farm-zoned land in Oregon?

Often, within limits. Oregon allows farm product processing facilities in exclusive farm use zones under state statute, with conditions on size and where the crops come from, plus county review. SASHKOV confirms the path for your parcel before design starts.

Can I build a processing facility on farm-zoned land in Oregon?

Often, within limits. Oregon allows farm product processing facilities in exclusive farm use zones under state statute, with conditions on size and where the crops come from, plus county review. SASHKOV confirms the path for your parcel before design starts.

Is my farm building exempt from a building permit?

Oregon and many Washington counties exempt certain agricultural buildings from the structural code. The exemption usually ends where processing, retail, offices or public access start, and electrical permits still apply. SASHKOV gets the determination in writing.

Is my farm building exempt from a building permit?

Oregon and many Washington counties exempt certain agricultural buildings from the structural code. The exemption usually ends where processing, retail, offices or public access start, and electrical permits still apply. SASHKOV gets the determination in writing.

Do I need SEPA review for an agricultural facility in Washington?

It depends on size and location. Some agricultural structures are categorically exempt; others need a SEPA checklist. Critical areas or shorelines can remove an exemption.

Do I need SEPA review for an agricultural facility in Washington?

It depends on size and location. Some agricultural structures are categorically exempt; others need a SEPA checklist. Critical areas or shorelines can remove an exemption.

How long does an agri-industrial permit take?

It depends on land use review, environmental permits and agency workload. The Permit Path Determination lists every permit, its agency and sequence, with a timeline in business days.

How long does an agri-industrial permit take?

It depends on land use review, environmental permits and agency workload. The Permit Path Determination lists every permit, its agency and sequence, with a timeline in business days.

What does SASHKOV do, and what do the engineers do?

SASHKOV determines the permit path, coordinates the licensed consultants who stamp their own scopes, produces the permit documents and carries the applications to issuance.

What does SASHKOV do, and what do the engineers do?

SASHKOV determines the permit path, coordinates the licensed consultants who stamp their own scopes, produces the permit documents and carries the applications to issuance.

What size of agri-industrial project does SASHKOV take on?

Typical projects run from 2,000 to 100,000 SF on sites under 40 acres. On larger programs SASHKOV teams with prime consultants.

What size of agri-industrial project does SASHKOV take on?

Typical projects run from 2,000 to 100,000 SF on sites under 40 acres. On larger programs SASHKOV teams with prime consultants.

Planning a project in this market?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)