Leasing an Older Portland Building? Check the Seismic Triggers First

In Portland, a change of use or occupancy can trigger seismic work under Title 24.85. The trigger depends on the new use, the occupant load increase and how much of the building changes.

A lease in an older Portland building can look simple until the permit review starts. If the new use changes the building's occupancy, Portland City Code Title 24.85 can require seismic upgrades, and that cost lands on whoever agreed to pay for permit work.

What triggers the review

For a change of use or occupancy, Portland says seismic requirements depend on the new use, how much the occupant load increases and what portion of the building changes. A Title 24.85 seismic trigger analysis compares the 2004 baseline occupant load to the proposed one.

Uses that move the needle

  • Office to assembly uses such as a restaurant, gym or event space.

  • A restaurant growing from fewer than 50 seats to 50 or more, which Portland names as a less obvious change of occupancy.

  • Office or retail to child care, education or residential uses.

The other upgrades that come with it

  • Accessibility. Up to 25 percent of construction cost may go toward removing existing barriers.

  • Fire and life safety. Exits must meet new construction standards, and sprinklers may be added.

  • Zoning. Parking, bike parking and site upgrades can apply.

Before you sign

  1. Confirm the building's existing permitted occupancy.

  2. Run a seismic trigger analysis for the planned use and occupant load.

  3. Price the accessibility, fire and zoning items with it.

  4. Write the lease so responsibility for triggered work is clear.

Frequently Asked Questions

Can a lease trigger a seismic upgrade in Portland?

A change of use or occupancy can, under Title 24.85, depending on the new use, the occupant load increase and how much of the building changes.

What is a seismic trigger analysis?

A comparison of the building's 2004 baseline occupant load to the proposed occupant load, used to decide whether Title 24.85 requirements apply.

What else does a change of occupancy trigger?

Accessibility, fire and life safety and zoning items can also apply.

Sources

Insights are general information researched from published sources on the date shown. Rules change, so confirm with the permitting authority before you act.

Facing a similar project?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Tigard

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Southwest Washington

Vancouver

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)