JURISDICTION

City of Gresham, OR

Gresham's Building Permits and Inspections division at City Hall handles building and trade permits. Applications and plans are submitted through the City's online permit system, and a submissions coordinator answers plan review questions.

Researched and maintained by SASHKOV · Last verified

2026-11-12

Permit stuck here? Send the correction letter or permit number.

QUICK ANSWER

Permitting authority: Building Permits and Inspections. Online submittals: Gresham online permit portal. Requirements, middle housing rules and SASHKOV's tips are below.

Permitting authority: Building Permits and Inspections. Online submittals: Gresham online permit portal. Requirements, middle housing rules and SASHKOV's tips are below.

How to apply

Building, electrical, mechanical, plumbing and renewable energy permits are applied for online, and plans are submitted directly through the online permit system. Plan review questions go to a submissions coordinator at 503-618-2845. In-person permit services are at City Hall, Monday through Friday, 8:00 am to 4:00 pm.

New homes, additions and remodels

Residential submittals use the City's new construction checklist and an erosion prevention and sediment control plan. Additions and remodels with plumbing work also use the plumbing checklist.

Middle housing

Gresham's Development Code lists duplexes, triplexes, quadplexes, townhouses and cottage clusters as permitted in all seven residential districts: LDR-5, LDR-7, TR, TLDR, MDR-12, MDR-24 and OFR. Only one cottage cluster is allowed per parent parcel. Triplexes, quadplexes, townhouses and cottage clusters also need public water and wastewater, street access that meets emergency vehicle standards, and adequate stormwater facilities.

Land use and pre-application

Planning projects use a pre-application conference form, with separate versions for sites in and out of a design district. Confirm which applies before the conference request goes in.

Inspections

Inspections run daily from 8:30 am to 3:30 pm. A request submitted before midnight is scheduled for the next day.

Tips from SASHKOV

  • Check the design district status first. It decides which pre-application form and which standards apply.

  • On a triplex or larger, confirm water, sewer, emergency access and stormwater before design starts, not after the first review.

  • Change of use projects in existing houses, such as residential care homes, need building code and land use answers together. Start with both.

Where to apply

Permitting authority: Building Permits and Inspections, Gresham City Hall, 1333 NW Eastman Parkway. Online submittals: Gresham online permit portal.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Site Snapshot

What can you build here?

Before you buy or design, get a report on one parcel: what the zoning allows, what stands in the way, utilities and the permit path. Delivered within 24 hours, Monday to Friday.

Frequently Asked Questions

Is middle housing allowed in Gresham's residential zones?

Yes. Gresham's Development Code permits duplexes, triplexes, quadplexes, townhouses and cottage clusters in all seven residential districts, with one cottage cluster per parent parcel.

Is middle housing allowed in Gresham's residential zones?

Yes. Gresham's Development Code permits duplexes, triplexes, quadplexes, townhouses and cottage clusters in all seven residential districts, with one cottage cluster per parent parcel.

How long is a Gresham plan review?

The City states first reviews are generally completed within about 3 weeks of a complete submittal, and later submittals usually take about 1 week.

How long is a Gresham plan review?

The City states first reviews are generally completed within about 3 weeks of a complete submittal, and later submittals usually take about 1 week.

What does a triplex or larger need in Gresham?

Triplexes, quadplexes, townhouses and cottage clusters need public water and wastewater, street access that meets emergency vehicle standards, and adequate stormwater facilities.

What does a triplex or larger need in Gresham?

Triplexes, quadplexes, townhouses and cottage clusters need public water and wastewater, street access that meets emergency vehicle standards, and adequate stormwater facilities.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Tigard

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Southwest Washington

Vancouver

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)