Seattle Rooftop Equipment Support Permit Recovery

Seattle, WA

Steep bluff slope above Puget Sound in Seattle

Stalled SDCI correction cycle carried through to completion.

A permit stalled in its second SDCI correction cycle, taken over from the original designer and resubmitted with a stamped connection detail.

A permit stalled in its second SDCI correction cycle, taken over from the original designer and resubmitted with a stamped connection detail.

Site & Location

Site & Location

A building in south central Seattle with a mechanical equipment support structure and open trellis over an existing roof deck.

Challenge

Challenge

The SDCI review sat in its second correction cycle on one structural comment: the City needed a framing plan and anchorage details showing how the new posts connect to the existing parapet. The original designer was no longer on the project.

Approach

Approach

Reviewed the drawing set and the full SDCI permit history Coordinated a Washington-licensed structural engineer for a stamped framing plan and parapet anchorage detail, limited to the support structure Incorporated the stamped detail into a revised structure sheet Wrote the response letter and resubmitted through the SDCI portal Stayed on as the reviewer's point of contact through issuance

Result

Result

Took over a stalled second correction cycle and carried the file, the engineer and the City correspondence through to completion under one contract.

Project facts

Project facts

County

King County

Permit type

SDCI construction permit, rooftop structure

Scope

Permit takeover, correction response, consultant coordination

Coordinated with

Washington-licensed structural engineer

SASHKOV status

Completed

Project stage

Complete

Engaged

Frequently Asked Questions

Can a stop-work order be resolved?

In most cases the path is the same: document what was built, provide the reports the jurisdiction asks for, and submit a permit that legalizes the work or lets it resume. The notice tells us where to start.

Can a stop-work order be resolved?

In most cases the path is the same: document what was built, provide the reports the jurisdiction asks for, and submit a permit that legalizes the work or lets it resume. The notice tells us where to start.

What do I need to send for a correction response?

The correction letter or checksheet, the current permit set and the permit number. SASHKOV reviews every comment, identifies which licensed consultants need to respond, and returns a plan for the resubmittal.

What do I need to send for a correction response?

The correction letter or checksheet, the current permit set and the permit number. SASHKOV reviews every comment, identifies which licensed consultants need to respond, and returns a plan for the resubmittal.

Facing a similar project?

Tell SASHKOV what you are working with. Start with the situation that matches yours.

Tell SASHKOV what you are working with. Start with the situation that matches yours.

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)