Seattle Backyard Office On-Site Consultation
Seattle, WA

Owners walked the site with the permit consultant and elected to proceed.
The same northwest Seattle lot, mapped within the Potential Slide Area with a steep bank, existing pool, decks, shed and mature trees near the proposed office.
SDCI confirmed in writing that it does not visit sites during plan review. The owners still wanted to walk the slope with the consultant running the permit before choosing an engineering path, and the resubmittal needed an existing conditions plan built from the site itself.
Led a three-hour site meeting with the owners and their design-build contractor Walked the SDCI record on the ground: corrections by reviewer, ECA mapping, the steep slope relief, the geotechnical report requirement, the landslide area covenant and the wet-season window Laid out the office footprint for discussion from the 2014 survey monuments, with the terrace alternative for comparison Documented the site for the existing conditions plan: pool, decks, shed, garage, fences, top of bank, trees with root zones and spot grades Issued a written record of questions, answers, decisions and open items, with an updated existing conditions site plan
Written record and updated site plan issued the same day as the visit, with cost by discipline, scope by discipline and a timeline to permit and construction start. The owners elected to proceed.
Jurisdiction
County
King County
Permit type
SDCI construction permit, detached accessory structure
Scope
On-site consultation, existing conditions documentation, written record
SASHKOV status
Completed
Project stage
Complete
Engaged
Documents delivered
Business days to delivery
2
Completed