PERMIT GUIDE

Selling a House with Unpermitted Work in Washington

Washington's seller disclosure asks directly whether every conversion, addition and remodel had its permits and final inspections. A no answer can cost the sale or the price.

Researched and maintained by SASHKOV · Last verified

2026-11-12

LAST VERIFIED

2026-11-12

SASHKOV CAN ALSO

Check the permit history, document what was built, and either legalize the work before listing or give the buyer a clear written path to a permit.

Under RCW 64.06.020, a Washington seller of residential property delivers a seller disclosure statement, commonly called Form 17. Its structural section asks three questions that unpermitted work cannot answer cleanly: have there been any conversions, additions or remodeling; if yes, were all building permits obtained; and were all final inspections obtained.

How the disclosure works

  • Delivery: the seller delivers the completed statement no later than five business days after mutual acceptance of a written purchase contract, unless the parties agree otherwise or the buyer has waived it.

  • Rescission: the buyer has three business days after delivery to rescind the agreement with a separately signed written statement, unless that right is waived or the parties agree otherwise.

  • Other questions that matter: the form also asks about zoning violations, nonconforming uses and any notice that would adversely affect the property.

Where unpermitted work shows up

  • The buyer's inspector notes a converted garage, a basement bedroom or an addition that is not in the permit history.

  • The appraiser excludes unpermitted square footage from the value.

  • The lender or insurer asks for permit records on the work.

  • The county record and the permit record do not match.

Your options before listing

  1. Confirm the record. Pull the permit history from the city or county. Some work that looks unpermitted was permitted and simply never finaled.

  2. Final an open permit. If a permit exists but was never finaled, reactivating or renewing it is usually the fastest fix.

  3. Legalize the work. Apply for the permits the work needed, with drawings of what was built and any changes needed to meet code.

  4. Disclose and price it. If time is short, disclose accurately and give the buyer a documented scope and path to a permit.

Why documentation helps even if you do not legalize

A buyer reacts to uncertainty. An existing conditions record and a written permit path turn an unknown into a defined scope, which keeps negotiations about the work rather than about risk.

Common questions

Do I have to disclose unpermitted work when selling in Washington?

The seller disclosure statement asks whether all building permits and all final inspections were obtained for conversions, additions and remodeling. Answer it accurately. For legal advice on disclosure, talk to a real estate attorney.

Can the buyer back out after seeing the disclosure?

The buyer has three business days after delivery to rescind, unless that right was waived or the parties agreed otherwise.

Is it faster to permit the work or disclose it?

It depends on the scope. Finaling an open permit can be quick. Legalizing an addition takes a full review. A Site Snapshot and permit history check tells you which you are facing.

Does unpermitted space count in the appraisal?

Appraisers often exclude it, which is one reason legalizing before listing can pay for itself.

How SASHKOV handles it

  • Pulls the permit history and checks it against what was built.

  • Prepares an existing conditions record of the unpermitted work.

  • Scopes and runs the legalization permit, or a written permit path for the buyer.

  • Coordinates structural and other licensed consultants under one SASHKOV contract.

Where a building requires a licensed architect or engineer of record, SASHKOV brings them into the contract.

Not sure what the record shows? Start with a Site Snapshot, delivered within 24 hours on business days. For full legalization, see Corrections and Permit Recovery.

Listing soon? Send the address and a list of the work, and SASHKOV will tell you which path fits your timeline in business days.

Sources

Guides are general information researched from each jurisdiction’s published sources on the date shown. Fees and rules change; confirm with the permitting authority before you act.

Have a site, a permit or a notice? Send it over.

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)