PERMIT GUIDE

Building Permits in Unincorporated Clark County, WA

Outside city limits, Clark County Community Development issues residential permits through its online Land Management System. The permit type you pick, NHC, ADS or ARS, decides what the County reviews.

Researched and maintained by SASHKOV · Last verified

2026-11-12

JURISDICTION BREAKDOWN

LAST VERIFIED

2026-11-12

SASHKOV CAN ALSO

Confirm the jurisdiction and permit type, prepare the set and site plan to the County's checklists, apply through the Land Management System and carry the permit to final.

If a property sits outside city limits, Clark County Community Development is the permitting authority. Cities such as Vancouver and Camas issue their own permits. Residential permits are applied for online through the County's Land Management System, CC LMS.

Permit types

  • NHC, new home construction: single family homes, duplexes and townhomes on their own parcel. It also applies to an existing home more than 60 percent destroyed, or repairs costing more than 60 percent of the assessed value.

  • ADS, additional dwelling or structure: additions, ADU remodels, garage conversions, carports, decks, pools and shops.

  • ARS, alterations and repairs, plus other types for demolition, fences and retaining walls, re-roofing, re-siding and windows, solar and damage investigation.

What needs a permit

  • New construction, additions, alterations and remodels.

  • A garage, carport or deck or patio cover.

  • Adding or removing walls, or adding a second story.

  • Converting a basement, attic or garage to living space.

  • Sheathing repair or replacement, re-roofing, siding and window replacement.

  • Retaining walls over four feet, measured from the bottom of the footing, or any wall supporting a load. These need engineering by a Washington registered engineer.

What does not

Exempt work must still meet setbacks and other code limits. The County lists fences 7 feet or less, decks 30 inches or less above grade unless used for a hot tub or pool, sheds 200 square feet or less that meet setbacks and easements, finish work, and patios and slabs at grade not on easements.

Trades and other agencies

  • Plumbing, heating and cooling, water and sewer connections and road approaches are included in NHC and ADS permits.

  • Lawn sprinklers and woodstoves need separate permits.

  • Clark County does not issue electrical permits. Those come from Washington Labor and Industries.

  • Environmental permits may also be required on some sites.

Before you apply

Check the property's jurisdiction, zoning and critical areas, and the permit history. A wetland, stream buffer or geologic hazard on the lot changes the site plan and can add a separate review before the building permit moves.

Common questions

Who issues building permits outside city limits in Clark County?

Clark County Community Development, through the online Clark County Land Management System.

Do I need a permit for a shed in Clark County?

Not for a shed of 200 square feet or less that meets setbacks and easements. Larger accessory buildings and shops use the ADS permit type.

When does a damaged house count as new construction?

When it is more than 60 percent destroyed or repairs cost more than 60 percent of the assessed value, the County uses the NHC new home construction permit.

Where do I get an electrical permit?

Clark County does not issue electrical permits. Apply through Washington Labor and Industries.

How SASHKOV handles it

  • Confirms the jurisdiction, zoning, critical areas and permit history for the parcel.

  • Prepares the site plan and permit set to the County's residential checklists.

  • Coordinates engineering for retaining walls, structure and critical areas under one SASHKOV contract.

  • Applies through CC LMS and carries the permit through inspection to final.

Where a building requires a licensed architect or engineer of record, SASHKOV brings them into the contract.

Start with a Zoning and Site Plan for the parcel, delivered in 3 business days. For review times inside the City of Vancouver, read Vancouver, WA Building Permit Review Times.

Building in Clark County? Send the address and scope, and SASHKOV will confirm the permit type and timeline in business days.

Sources

Guides are general information researched from each jurisdiction’s published sources on the date shown. Fees and rules change; confirm with the permitting authority before you act.

Have a site, a permit or a notice? Send it over.

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)