Why Permits Stall in Corrections, and How to Get Them Moving

Most stalled permits in the Seattle area are waiting on an answer, not on the city. Here is how to find out who has the ball and close the open items.

A permit that has gone quiet is rarely stuck for one reason. In Seattle and the cities around it, most stalled permits are waiting on an answer that someone owes, and often nobody on the project knows it is theirs.

Check who actually has it

The portal status says more than most people read into it. If corrections are required, the city is waiting on the applicant. If the permit is in review, some reviewers have signed off and some have not. If it is waiting on information, something was asked for that never came in. The first step on any stuck permit is to pull the status, every letter and every reviewer note, and write down who owes what to whom.

One reviewer can hold the whole permit

Plan review is split by discipline: zoning, building, structural, drainage, fire, transportation, and sometimes critical areas or energy. Each reviewer signs off on their own clock. Six approvals and one open comment is still a permit that has not issued, so every reviewer has to be tracked separately.

The third correction letter

Each correction cycle goes back into the reviewer’s queue. A response that answers the comments but misses what they were pointing at buys another letter and another wait. Read every comment for what the reviewer needs, answer each one with the sheet and the detail, check the set against the city’s own requirements, and ask the reviewer about an unclear comment before resubmitting, not after.

Holds outside the city

Sometimes the city is done and the permit still waits on a water purveyor’s availability letter, a sewer district sign-off, a health department review or a state permit. Those holds are usually not in the city’s portal, so they need their own list and their own follow-up.

Do not let the application lapse

In Washington, a complete building permit application vests to the codes in effect when it was filed (RCW 19.27.095). An application that expires and has to be filed again is reviewed under the codes in effect at that point, which can mean redesigning a set that was close to approved. Check the expiration rules, the response deadline on every letter and the extension process before the dates pass.

How SASHKOV handles it

SASHKOV takes over stalled permits as the single point of contact: the record, the correction response, the consultants on their disciplines, the outside agencies and every conversation with the reviewers through issuance. Nobody controls the city’s queue, so there is no promised issue date, but every open item has an owner and a next step.

Facing a similar project?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

OREGON

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

WASHINGTON

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)