Deschutes County, OR

Deschutes County's Community Development Department runs Planning, Building Safety and Onsite (septic) programs, and took over the City of Sisters building program in July 2016. Permits are applied for through Oregon ePermitting after property research determines whether Planning or Onsite permits are needed first.

Researched and maintained by SASHKOV · Last verified

2026-11-02

WORKED HERE

Yes

LAST VERIFIED

2026-11-02

QUICK ANSWER

Permitting authority: Community Development Department. Online submittals: Oregon ePermitting. Requirements by permit type, review steps and SASHKOV's tips are below.

Permitting authority: Community Development Department. Online submittals: Oregon ePermitting. Requirements by permit type, review steps and SASHKOV's tips are below.

Common application types

  • 1 and 2 Family Dwelling and Structural (DWL / STR)
  • Accessory Dwelling Unit (Planning ADU Permit)
  • Agricultural or Equine Exempt
  • Agriculture Building
  • Commercial Structural
  • Manufactured Dwelling Placement
  • Driveway Access
  • Residential and commercial electrical, mechanical and plumbing
  • Onsite: Site Evaluation, New Construction and Installation, Repair, Onsite Authorization, Tank Abandonment

New homes and additions

Dwelling and structural permits require a Residential Building Information Form, a site plan, stamped truss and structural or beam calculations where applicable, and a construction plan set that is not marked preliminary or not for construction. Prerequisites include any land use approval, an approved septic system or approval to install one, and a driveway permit if research shows one is needed. Uploads must be PDFs only, and incomplete applications are withdrawn.

ADUs and middle housing

Rural ADUs are allowed only in rural residential exception areas (the RR-10, MUA-10, UAR-10 and SR 2-1/2 zones and the Westside Transect (WTZ) combining zone) on lots of at least 2 acres, or 5 acres in South Deschutes County, and not in unincorporated communities such as Tumalo, Terrebonne or Sunriver or in the EFU, F1, F2 or OS&C zones. One ADU of up to 900 sq ft of usable floor area is allowed within 100 feet of the primary dwelling. A septic site evaluation must be completed before the Planning ADU Permit application, followed by the onsite, driveway and DWL or STR building permits.

Decks, retaining walls and accessory structures

Certain agriculture buildings may be exempt from structural building permits under ORS 455.315 through the Agricultural or Equine Exempt permit. The County pages reviewed do not publish exemption thresholds for sheds, decks or retaining walls.

Commercial tenant improvements and change of use

Commercial Structural permits require a Commercial Building Application, a site plan and an architectural and structural construction plan set, with land use and septic approvals confirmed first. Additional permits may be required depending on scope, and incomplete applications are withdrawn.

Land use review

County land use files include conditional uses, site plan reviews, plan amendments with zone changes, text amendments and modifications, with hearings before the Hearings Officer, the Planning Commission or the Board of County Commissioners. Combining zones such as Landscape Management (LM), Wildlife Area (WA), Surface Mining Impact Area (SMIA) and Airport Safety (AS) can add review requirements. Pre-application meetings can be requested and are suggested for ADUs.

Corrections and review

The County publishes in-queue targets for residential building permits of about 1 week for intake, about 10 days for planning review and 8 to 9 weeks for building review, run concurrently, and about 4 to 6 weeks for onsite review. Times are measured from a complete application; staff email when information is missing and the application is treated as incomplete and withdrawn.

Tips from SASHKOV

  • Schedule the septic site evaluation early for rural ADUs; the County notes it typically takes about 4 weeks and winter weather can delay it.
  • Combine related documents into single PDFs; photos of documents and ZIP files are not accepted.
  • A new primary home and ADU built together require two separate DWL permits.

Where to apply

Permitting authority: Community Development Department. Online submittals: Oregon ePermitting.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)