JURISDICTION

City of Shoreline, WA

Shoreline Planning & Community Development provides planning, permitting and inspections, with each permit type tied to its own submittal checklist. Applications and pre-application requests are submitted through the eTRAKiT permitting portal. Some trade permits such as plumbing or mechanical can be issued the same day.

Researched and maintained by SASHKOV · Last verified

2026-11-02

PORTAL

WORKED HERE

Not yet

LAST VERIFIED

2026-11-02

QUICK ANSWER

Permitting authority: Planning & Community Development. Online submittals: eTRAKiT. Requirements by permit type, review steps and SASHKOV's tips are below.

Permitting authority: Planning & Community Development. Online submittals: eTRAKiT. Requirements by permit type, review steps and SASHKOV's tips are below.

Common application types

  • Residential new build
  • Tenant Improvement
  • Site Development Permit
  • Subdivision - Preliminary Short Plat
  • Subdivision - Preliminary Formal Plat
  • Lot line adjustment
  • Special Use Permit
  • Variance
  • Rezone of Property
  • Pre-Intake Record

New homes and additions

New residential submittals include a site plan with coverage calculations, civil plans for grading, utilities and drainage, structural calculations, WA State Energy Code compliance forms and a heating system sizing form. A geotechnical report is required for 500 cubic yards or more of fill or excavation or sites containing or bordering slopes of 15% or steeper, and critical areas reports are required in or near critical areas. A Surface Water Report is required for 2,000 sq ft or more of new and replaced hard surfaces, and a tree worksheet is required, with an ISA-certified arborist evaluation for work in the critical root zone of retained trees.

ADUs and middle housing

Shoreline City Council adopted middle housing into the Development Code with Ordinance 1027 on January 13, 2025, as part of new Neighborhood Residential zoning rules that allow more housing types citywide. The City publishes NR 1, NR 2 and NR 3 summaries and a Neighborhood Residential Handbook, which does not replace the standards in SMC Chapter 20.

Decks, retaining walls and accessory structures

The City publishes a Permit Exemptions handout listing work typically exempt from permits. Structural calculations are required for retaining walls over 4 ft tall, measured from bottom of footing to top of wall.

Commercial tenant improvements and change of use

Tenant improvement submittals include a permit application, critical area worksheet, construction drawings with floor and reflected ceiling plans, 2021 Shoreline Commercial Energy Code compliance, a sewer use form and a water availability certificate. A change of use that requires a new certificate of occupancy is one case that calls for a TI permit, and zoning questions go to a planner under SMC 20.50. A Pre-Intake Record submitted through eTRAKiT starts the intake process.

Land use review

Land use applications include administrative design review, subdivisions and short plats, lot line adjustments or lot mergers, conditional or special use permits, rezones, variances and shoreline permits. A pre-application meeting is optional and intended for more complex projects, with written feedback from each review discipline. Requests are submitted through eTRAKiT using the pre-application submittal checklist.

Corrections and review

Turnaround depends on permit type, project complexity and document quality, and the City publishes average building permit turnaround times over the last year.

Tips from SASHKOV

  • A Waste Diversion Plan and Salvage Assessment applies to construction over 1,000 sq ft of gross floor area or any demolition.
  • A Declaration of Covenant for stormwater facilities is required when on-site stormwater facilities are proposed.
  • SWPPP type depends on the project's Surface Water Project Classification under EDM Section 21.

Where to apply

Permitting authority: Planning & Community Development. Online submittals: eTRAKiT.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)