JURISDICTION

City of Keizer, OR

Keizer's Building Permit Division, part of the Planning Department, works with Marion County Building Inspection to approve and issue permits inside city limits. Some permits are applied for at the City and others directly with Marion County, and the City's FAQ notes that building permits filed at the City use a Marion County permit application. Zoning and land use review is handled by the Keizer Planning Division.

Researched and maintained by SASHKOV · Last verified

2026-11-02

QUICK ANSWER

Permitting authority: Planning Department, Building Permit Division. Online submittals: Oregon ePermitting. Requirements by permit type, review steps and SASHKOV's tips are below.

Permitting authority: Planning Department, Building Permit Division. Online submittals: Oregon ePermitting. Requirements by permit type, review steps and SASHKOV's tips are below.

Common application types

  • Single family home
  • Residential interior remodel
  • Accessory structure or fence
  • Commercial new or alteration
  • Tenant improvement or change of use
  • Sign (building permit)
  • Electrical, mechanical and plumbing permits
  • Septic (Marion County)
  • Deferred submittals (Marion County)

New homes and additions

Single family homes and residential remodels are applied for at the City of Keizer; additions, room conversions (attic, garage, basement) and changes to walls, windows or doors generally need a permit. Septic permits and plumbing or electrical permits with plan review are handled by Marion County. Keizer zoning standards apply in addition to the state building code.

ADUs and middle housing

Keizer's development code includes attached and detached accessory dwelling units (KDC 2.403) and cottage cluster development (KDC 2.432). A Middle Housing Land Division (KDC 3.115) is available for duplexes, triplexes, quadplexes, townhouses and cottage clusters, reviewed by the Zoning Administrator; submittals include a preliminary plat, written statement, title instrument and draft easements, and each child lot needs separate water and sewer connections.

Decks, retaining walls and accessory structures

The City lists garages, carports or sheds larger than 200 sq ft, and decks, porches or stairs more than 30 inches above ground, as projects likely to need a permit; pool, hot tub and spa fences also need one. Keizer publishes separate zoning flyers for accessory structures (KDC 2.313) and fences, walls and hedges (KDC 2.312.10).

Commercial tenant improvements and change of use

Tenant improvements, change of use and new or altered commercial buildings are applied for at the City of Keizer, while fire sprinkler systems and electrical or plumbing permits with plan review go to Marion County. The City notes that almost all commercial projects require a permit.

Land use review

Keizer's Planning Division processes partitions, subdivisions, property line adjustments, middle housing land divisions, variances (including minor variances), conditional uses, comprehensive plan map amendments and zone changes, master plan amendments and floodplain development permits. The City publishes a Pre-application Meeting Request form with its informational flyers.

Tips from SASHKOV

  • Check the City's Where to Apply list first: some permit types are filed only with the City, some only with Marion County, and some with either.
  • Septic, fire sprinkler and deferred submittals go to Marion County Building Inspection, not the City.
  • Final plats for middle housing land divisions must be recorded within 2 years of the final decision.

Where to apply

Permitting authority: Planning Department, Building Permit Division. Online submittals: Oregon ePermitting.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)