JURISDICTION

City of Everett, WA

Permit Services processes construction permits for private development in Everett, with plan review by Planning, Building, Fire and Public Works disciplines. Applications are submitted through the City's Online Permitting Portal by selecting a permit type and subtype and uploading documents per the applicable submittal checklist. No fees are due at submittal; plan review fees are invoiced after acceptance and must be paid before routing.

Researched and maintained by SASHKOV · Last verified

2026-11-02

DEPARTMENT

WORKED HERE

Not yet

LAST VERIFIED

2026-11-02

QUICK ANSWER

Permitting authority: Permit Services. Online submittals: Online Permitting Portal. Requirements by permit type, review steps and SASHKOV's tips are below.

Permitting authority: Permit Services. Online submittals: Online Permitting Portal. Requirements by permit type, review steps and SASHKOV's tips are below.

Common application types

  • Residential Building
  • Commercial Building
  • Demolition
  • Adult Family Home
  • Site Work
  • Traffic Street Use
  • Water/Sewer Utility
  • Sign
  • Residential Photovoltaic

New homes and additions

Residential Building permits cover new construction and remodels of one- and two-family dwellings, townhomes and ADUs/DADUs, and the submittal checklist varies by subtype and must be completed and submitted with the application. Work outside the building footprint is permitted separately as a Site Work permit. New critical areas regulations apply to applications received after June 1, 2026, and implementation of the 2024 Washington State Building Codes is delayed until May 3, 2027.

ADUs and middle housing

ADUs and DADUs are permitted under the Residential Building permit type, while multifamily buildings of 3 or more units, including attached ADUs, are permitted as Commercial Building. The Everett 2044 development regulations update (Ordinance 4102-25) was adopted June 18, 2025 and took effect July 8, 2025. The May 2025 Planning Commission memo on the regulations describes the Neighborhood Residential (NR) zone as allowing all middle housing types, detached houses and ADUs, with no maximum density and unit count limited by height, setbacks and lot coverage.

Commercial tenant improvements and change of use

Commercial, multifamily and industrial work is permitted as Commercial Building, with separate submittal checklists for tenant improvements and change of occupancy. A change of occupancy submittal requires a code analysis identifying the International Existing Building Code compliance method (prescriptive, work area or performance), and a Washington-licensed architect's stamp is required for projects over 4,000 square feet, more than 4 dwelling units, or where life safety or structural systems are affected.

Land use review

Planning uses a generic land use application for Review Processes I, II and III, with separate checklists for administrative use permits, conditional use permits, variances, development standards modifications and subdivisions. Pre-application meetings are requested through a Preapplication Meeting Request form.

Corrections and review

Each discipline issues its own correction letter, and applicants should wait until all disciplines have approved or issued corrections before resubmitting; Building and Public Works permits can be resubmitted separately. Resubmittals are uploaded to the Online Permitting Portal with the naming format Re-Review_DocumentType_MM.DD.YYYY and a transmittal sheet emailed to Permit Services. The City does not publish review time targets and reviews permits generally in the order received.

Tips from SASHKOV

  • Email the completed transmittal sheet with every digital resubmittal; the City states that failing to do so will delay review.
  • Upload resubmittal documents through the Attachments link (paper clip symbol) on the permit in the portal dashboard.
  • Permit counter appointments are limited to 15 minutes and virtual appointments are no longer offered.

Where to apply

Permitting authority: Permit Services. Online submittals: Online Permitting Portal.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)