JURISDICTION

City of Eugene, OR

The City of Eugene runs its own building program through Building and Permit Services in the Planning and Development Department. Applications, drawings and trade permits are submitted through eBuild, and plan review projects are assigned a project coordinator tracked by log number. Review covers land use, erosion control, public works, building code, and fire access and water supply.

Researched and maintained by SASHKOV · Last verified

2026-11-02

QUICK ANSWER

Permitting authority: Planning and Development, Building and Permit Services. Online submittals: eBuild. Requirements by permit type, review steps and SASHKOV's tips are below.

Permitting authority: Planning and Development, Building and Permit Services. Online submittals: eBuild. Requirements by permit type, review steps and SASHKOV's tips are below.

Common application types

  • Residential building permit (plan review)
  • Residential Express Permit
  • Commercial building permit (plan review)
  • Commercial Express Permit
  • Electrical, mechanical and plumbing specialty permits
  • Partition, Tentative
  • Middle Housing Land Division, Tentative
  • Conditional Use Permit
  • Planned Unit Development, Tentative Plan
  • Willamette River Greenway Permit

New homes and additions

New single-family homes, duplexes and secondary dwelling units, plus additions, alterations, garage conversions, decks and retaining walls require a building permit submitted through eBuild using the residential file naming standards. Applicants should confirm zoning standards in Eugene Code Chapter 9 and address stormwater management, erosion prevention and utility connections. Smaller projects on an existing single-family dwelling or duplex, including single-story additions under 500 sq ft, may qualify for a same-day Residential Express Permit unless excluded by land use conditions, a FEMA Special Flood Hazard Area, an erosion permit requirement, creation of a new dwelling unit or overall building area over 3,599 sq ft.

ADUs and middle housing

ADUs are permitted in all residential zones on lots with a single primary dwelling. The City's ADU handout limits ADU building square footage to the smaller of 10 percent of lot area or 800 sq ft (EC 9.2751(17)); in the Amazon, Fairmount and South University neighborhood areas the limit is 600 sq ft on lots under 9,000 sq ft, with bedroom limits. Eugene amended its land use code under HB 2001 to allow duplexes, triplexes, fourplexes, cottage clusters and townhouses in residential zones, and offers a Middle Housing Land Division application with a choice of the Eugene Code procedure or the expedited state procedure (decision within 63 days, no public notice). The City also runs a Pre-Approved ADU Plans program.

Decks, retaining walls and accessory structures

Decks, retaining walls and accessory structures such as garages, carports and shops require a building permit, while small storage sheds and play equipment are exempt but must still meet setbacks and height limits. Decks designed to IRC R507 and single-story garden sheds or shops under 500 sq ft on an existing single-family dwelling or duplex can qualify for Residential Express.

Commercial tenant improvements and change of use

Commercial tenant infill and single-tenant alterations under 10,000 sq ft may qualify for a Commercial Express Permit, as can a change of use or occupancy that does not add or reclassify to an A, E, I, H or R occupancy. Projects in the Special Flood Hazard Area, with hazardous materials, high-piled storage or historic structure alterations go through standard plan review in eBuild.

Land use review

Eugene land use applications include tentative partitions, tentative middle housing land divisions, conditional use permits and planned unit developments. A pre-application conference is required for conditional use permits, PUD tentative plans and Willamette River Greenway permits, and may be requested for large, complex or multi-application projects.

Corrections and review

Each plan review project has an assigned project coordinator, and supplemental information can be submitted before the review cycle begins. The City does not publish specific plan review timeframes, noting they vary by scope; Express Permits are usually issued the same day as the review appointment.

Tips from SASHKOV

  • Check Residential and Commercial Express eligibility before submitting; qualifying projects can often be issued at a same-day appointment.
  • Properties in the Amazon, Fairmount or South University neighborhood areas have different ADU size limits and are excluded from Residential Express.
  • Contact EWEB and Northwest Natural before construction, including before pouring foundations for new gas service.

Where to apply

Permitting authority: Planning and Development, Building and Permit Services. Online submittals: eBuild.

On your own or with SASHKOV

ON YOUR OWN

WITH SASHKOV

Find the rules

Read the code, zoning and checklists yourself

Researched and confirmed for your site

Prepare documents

Draw the set, or hire each consultant separately

Permit set prepared, with licensed consultants under one contract

Corrections

Answer each reviewer comment yourself

Responses prepared and resubmitted

Deadlines

Track intake, expirations and inspections

Tracked in business days from intake to issuance

Sources

Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.

Projects here

Projects here

No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.

Starting a project here?

Where SASHKOV’s projects take shape across
Oregon & Washington

Where SASHKOV’s projects take
shape across Oregon & Washington

OREGON

Portland Metro

Multnomah County:

Beaverton

Hillsboro

Banks

Unincorporated Washington County

Milwaukie

Oak Grove

Estacada

Rhododendron Unincorporated Clackamas County

Milwaukie

Oak Grove

Estacada

Rhododendron

Unincorporated Clackamas County

Willamette Valley

Lane County:

Eugene

Oregon Coast

Tillamook County:

Tillamook

Bay City

Central Oregon

Deschutes County:

Bend

WASHINGTON

Puget Sound

Lake Stevens

Edmonds

Unincorporated Snohomish County

Southwest Washington

Brush Prairie

Yacolt

Unincorporated Clark County

© 2026 SASHKOV GROUP LLC dba SASHKOV. All Rights Reserved.

© 2026 SASHKOV GROUP LLC dba SASHKOV.

All Rights Reserved.

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

UEI TENDYXDNE578 · CAGE 26WF7

NAICS 541611 · 541340 · 541618 · 541990

Insured: General Liability & Professional Liability (E&O)

Insured:

General Liability &

Professional Liability (E&O)