JURISDICTION
City of Bonney Lake, WA
The Permit Center in the Public Services Department handles building, mechanical, plumbing, sign and land use permits, located at the Public Services Center in Buckley. Most applications are submitted electronically as PDFs using the City's online forms; the Online Permit Portal is used only for residential furnace, generator, heat pump and water heater permits. Review does not begin until all materials are received and all fees are paid. Electrical permits come from Labor and Industries, and septic and food safety from the Tacoma-Pierce County Health Department.
Researched and maintained by SASHKOV · Last verified
2026-11-02
PORTAL
COUNTY
WORKED HERE
Yes
LAST VERIFIED
2026-11-02
QUICK ANSWER
Common application types
- Residential New Construction
- Residential Addition/Remodel
- Accessory Dwelling Unit
- Accessory Structure
- Deck
- Commercial Tenant Improvement
- Change of Occupant
- Demolition
- Land Use Application
- Pre-Application Conference
New homes and additions
New residential submittals include a cover sheet with impervious surface and design parameters, a site plan meeting the Basic Site Plan Standards, full architectural and framing plans, structural calculations stamped by a Washington-licensed engineer, and the WSU energy code form. A water availability letter and either a sewer availability letter or TPCHD septic approval are required, and stormwater review is required when 500 square feet or more of hard surface is added or replaced, following the Pierce County Site Design and Stormwater Management Guide and the 2021 Pierce County Stormwater and Site Development Manual. Critical areas and shoreline jurisdiction can change building location, height and size and may require critical area or shoreline exemptions or permits.
ADUs and middle housing
ADUs use a separate ADU building application, which requires water and sewer (or septic) approvals and a road approach application, with traffic and park impact fees paid at issuance. The City states the ADU application is being updated to comply with Ordinance 1737, effective June 22, 2025. ADU size and count limits and middle housing implementation status were not identified on the City pages reviewed.
Decks, retaining walls and accessory structures
Exempt residential work includes fences up to 6 feet, retaining walls up to 4 feet that do not support a surcharge, one-story detached accessory structures up to 200 square feet, and decks of 200 square feet or less, no more than 30 inches above grade, not attached to the dwelling and not a required exit. Exempt work must still meet zoning, setback, critical area, shoreline, civil and utility requirements, and removing any structure over 120 square feet needs a demolition permit.
Commercial tenant improvements and change of use
Commercial, industrial and non-residential permits include tenant improvements and change of occupant applications. All business locations need Sumner-Bonney Lake Joint Pre-Treatment Program sewer screening, and commercial tenant improvement and change of occupant applications must include the Sumner determination letter.
Land use review
Many planning applications begin with a Land Use Application, with a separate application required for each permit and submittal worksheets for most application types. Pre-application meetings are a preliminary review held Thursdays at 2:00 and 3:00 p.m. on a first come, first served basis, and appointment times are not held without a submittal package.
Tips from SASHKOV
- Check critical areas and shoreline jurisdiction before applying, since they can change building location, height and size.
- Submit an Owner Authorization Form from each property owner.
- Residential application forms cannot be saved, so have all information ready before starting.
Where to apply
Permitting authority: Public Services Department, Permit Center. Online submittals: Online Permit Portal.
On your own or with SASHKOV
Find the rules
Read the code, zoning and checklists yourself
Researched and confirmed for your site
Prepare documents
Draw the set, or hire each consultant separately
Permit set prepared, with licensed consultants under one contract
Corrections
Answer each reviewer comment yourself
Responses prepared and resubmitted
Deadlines
Track intake, expirations and inspections
Tracked in business days from intake to issuance
Sources
Breakdowns are general information researched against the jurisdiction’s published sources on the date shown. Requirements change; confirm with the permitting authority before you commit to a design or a purchase.
No published projects here yet. SASHKOV works with this jurisdiction; start a project to talk through yours.
Starting a project here?
OREGON
Portland Metro
Multnomah County:
Beaverton
Hillsboro
Banks
Unincorporated Washington County
Willamette Valley
Lane County:
Eugene
Oregon Coast
Tillamook County:
Tillamook
Bay City
Central Oregon
Deschutes County:
Bend
WASHINGTON
Puget Sound
Southwest Washington
Brush Prairie
Yacolt
Unincorporated Clark County