PERMIT GUIDE
Stop-Work Orders and Unpermitted Work in Portland
A Portland stop work order halts everything except work that fixes the violation. Unpermitted work is permitted the same way as new work, with covered work exposed for inspection.
Researched and maintained by SASHKOV · Last verified
2026-11-07
JURISDICTION BREAKDOWN
LAST VERIFIED
2026-11-07
SASHKOV CAN ALSO
Record existing conditions before covered work is opened, prepare the permit set for the work as built, coordinate the structural engineer, and answer corrections through to final inspection.
What the order means
Portland may issue a stop work order for work started without a required permit (Portland City Code 3.30.080). It is posted at the site, copied to the owner and effective when posted. All work stops except work that eliminates the violation, and it resumes only with written approval.
Deadlines
If the order was issued in error, request a review in writing within 15 calendar days. The decision can be appealed to the Code Hearings Officer.
Monthly code enforcement fees start once 30 calendar days have passed since the notice took effect.
What it costs
From the enforcement fee schedule effective July 10, 2026:
Stop work order penalty: $763
Investigation fee for work started before a permit: $161 minimum, $161 per hour
Enforcement reinspection fee: $243
Monthly code enforcement fee: $394 for 1 to 2 units, $590 for 3 to 10, $786 for 11 to 19, $981 for 20 or more. It doubles once a property has been in violation 3 months.
Unpaid fees plus a 10% charge are recorded as a lien in the City's docket until paid and the violations are certified corrected.
Legalizing the work
The process is the same as for new work, with an extra step at inspection. Plans show the existing unpermitted work as new, and covered work must be exposed; the inspector decides how much. Applications go through Development Hub PDX.
A buyer, realtor or lender may require unpermitted work to be permitted, corrected and inspected before closing, and insurers may refuse to cover it.
How SASHKOV handles it
Reads the notice and sets the response dates in business days.
Records existing conditions and prepares the as-built drawings.
Brings in the structural engineer or other licensed professional the work needs, under one contract.
Prepares the permit application, answers corrections and coordinates inspections through issuance.
More on Portland: the City of Portland breakdown.
Sources
Guides are general information researched from each jurisdiction’s published sources on the date shown. Fees and rules change; confirm with the permitting authority before you act.
Have a site, a permit or a notice? Send it over.
OREGON
Portland Metro
Multnomah County:
Beaverton
Hillsboro
Banks
Unincorporated Washington County
Willamette Valley
Lane County:
Eugene
Oregon Coast
Tillamook County:
Tillamook
Bay City
Central Oregon
Deschutes County:
Bend
WASHINGTON
Puget Sound
Southwest Washington
Brush Prairie
Yacolt
Unincorporated Clark County